Dan Hayes

Taco Bell – Kuna, Idaho

HC Company, Inc. is excited to be a part of the first Taco Bell to be built in the rapidly growing town of Kuna, Idaho.  This will be HC’s second opportunity to construct a Taco Bell for owner / operator ES-O-EN Management.  The building footprint is 2,086 square foot and sits on a .90-acre lot within the Merrell Towne Center on Highway 69/Meridian Road.  The new building will be wood framed and cladded with a combination of custom metal panels, custom fiber cement Nichia siding, and stucco.  The interior scope of work includes complete build out of the dining room and kitchen with installation of all Owner provided equipment.  Estimated completion is slated for early August 2018.

1420 Grove

1420 Grove Street, in downtown Boise, will be getting a fresh look! The new Owner’s of the building selected HC Company, Inc. to provide General Contractor services for their remodel. The scope of work includes demolition of the existing interiors, updated exterior finishes, and construction of the tenant space. The existing building shell will be demised into 3 tenant suites; 2 of which will be occupied at the end of construction. Estimated completion is slated for early summer 2018.

BioWest Ag Solutions

The local, BioWest Ag Solutions, has chosen HC Company, Inc. as their General Contractor for a new production and office facility in Caldwell, Idaho. In conjunction with NeuDesign Architecture, HC Company has been providing CM/GC services with preliminary budgeting and cost analysis. The project consists of 10,625 square feet of production facility and 4,851 square feet of new office space. The production building, constructed of structural steel framing and an insulated metal panel skin, will house BioWest Ag Solutions’ proprietary propagation and fermentation processing equipment. The office area will house two laboratories and an autoclave room that will require a custom millwork and finish package for eliminating airborne contaminants during soil testing, microbial isolation and characterization processing. In addition, the office will consist of open work areas, conference and break rooms. The building will sit on a 2.25 acre site that will include new asphalt paving sections rated for heavy traffic use, on site drainage facilities, landscape, and hardscapes. Scheduled delivery date for the project is early October 2018.

Main Office Boise Location
12650 W. Bridger St., Suite 100
Boise, ID 83713
P: 208.321.4990
F: 208.321.4923

Twin Falls Location
205 Shoshone St., Suite 203
Twin Falls, ID 83301
P: 208.933.2626

Contact Us Today!